| 1. | Optimal reactive power planning in area power system 地区电网无功优化规划 |
| 2. | Code for urban electric power planning 城市电力规划规范 |
| 3. | Mathane turn off power plan realized in stope substation low valtage main switch 甲烷断电功能在采区变电所低压总开关中的实现方案 |
| 4. | Optimization of reactive power planning of distribution systems based on improved genetic algorithm 基于改进遗传算法的配电网无功优化规划 |
| 5. | The purpose of the dissertation is to discuss the goal programming models and its application in electric power plan 本文在线性规划模型的基础上论述了电源规划的目标规划模型。 |
| 6. | According to the characteristics of reactive power planning optimization , a fullyscheme of refined ga was proposed in this thesis 根据电力系统无功规划优化问题的特点,提出了改进遗传算法的完整实现方案。 |
| 7. | Part five analyzes that how to use goal programming model in energy power plan and that how to get the results 第四章论述了电源规划的目标规划模型及其解法,并给出了实例分析。电源规划的目标规划模型具有实用价值。 |
| 8. | Based on the dc power flow model , a practical single - stage power planning model with multiple objectives is set up in this thesis 本文考虑到实际规划工作中的特点和约束条件,以直流潮流模型为基础,对单阶段电网规划建立了实用的多目标网架规划模型。 |
| 9. | In 2002 , the reform of " seperating power plan and grid , selling with competitive cost " was put into execution formally , at the end of the 2002 , five power company , two grid company and four company were founded 2002年, “厂网分开,竞价上网”的改革正式推动,同年底,新组建的五家发电公司、两家电网公司和四家辅业公司挂牌成立。 |
| 10. | Since the evening of nineties , the automatization level has made good progress in firepower power plan . the capability of single unit is getting more and more , and the size of the central workshop is getting larger and larger 自90年代后期,火力发电厂的自动化水平不断提高,单机容量不断增大,主厂房体型越来越大,厂房高度、跨度、高度差加大。 |